fbpx

Sheffield University Campus Living Village

Project Description

Rockingham House is a legendary accommodation for students in Sheffield located a fantastic location with the University of Sheffield only a 4-minute walk away, and you can be at Sheffield Hallam University in 10 minutes. Your city centre location means you’ll be close to shops, restaurants, bars, live music and culture, giving you the best in student living. “The location is perfect for any student in Sheffield as the house is located just off West Street which is close to local amenities and is a short walk to the city. I highly recommend this accommodation to any student be they from the UK or international.” – Amy Hammond-Robinson Select Rockingham House and you can choose from contemporary 4 and 6 bedroom flats, competitively priced with some great offers and a very low £50 deposit – perfect for groups and SO much better than a shared house. Each student bedroom has a large, comfortable bed, a study area, ample storage space and a modern en suite bathroom. Flats have a shared kitchen with appliances, and a relaxing spacious multiuse common room so you can unwind with friends after lectures. There is also a blazingly fast glide 1 Gbps (*Wifi speeds may vary but are estimated at 250Mbps) available throughout the building. There is a large combined communal study room for students to use. Laundry facilities are available 24/7, and there’s secure bike storage available too. The large communal courtyard is the perfect place for summer barbecues and to socialize with your friends. All utility bills are included for peace of mind. The on-site team are there to answer any questions you might have and there’s CCTV and a key fob door entry system for your security and safety. Go Back

Project Challenge

It’s time to put on makeup. It’s time to dress up right. It’s time to raise the curtain on the Muppet Show tonight. The mate was a mighty sailin’ man the Skipper brave and sure.

01

Tasked to create the schematic diagram for the CCTV system across the entire site for the installation team to lay the cables at Phase 1.

02

Return onsite to fit out Phase 2 installing over 53 Cameras including within elevators

03

Work alongside 100s of contractors working on a busy construction site.

What We Did

Created a schematic wiring diagram for the contract team to adhere to.

Result

Fully completed working CCTV System that currently keeps the occupants and the staff safe

0

Completed Projects
Counter Icon

0

Team Members
Counter Icon

0

Satisfied Clients
Counter Icon

0

Counter Icon

Fantastic Reviews from Happy Clients

View the feedback we’ve received from our very satisfied customers